Milestones / Development Activites / PMGSY

Pradhan Mantri Gram Sadak Yojana(PMGSY)

PMGSY

The Prime Minister’s Gram Sadak Yojana (PMGSY) is a scheme for development of rural roads in India. The Government of India has succeeded in providing road connectivity to 85 per cent of the 178,184 eligible rural habitations in the country under the scheme. All villages in the country are expected to be connected through a road network by 2019, as against 2022 previously, under the PMGSY.

Since 2005 Anantkumar Hegde has brought in funds from Pradhan Mantri Gram Sadak Yojana in order to connect the remote areas and its populace with all weather roads. Below are the details about the PMGSY works carried out in Uttara Kannada District and also in Gokak and Khanapur of Belagavi Districts

All Project Details under PMGSY

LONG SPAN BRIDGES Under Pradhan Mantri Gram Sadak Yojana

Taluk Name Project PDF
Joida Bridge Across Castle Rock- Diggi CH 15.10 KM PDF
Joida Bridge Across Castle Rock- Diggi CH 21.30 KM PDF

PMGSY works under taken in 2000-2001

Taluk Name Road Name cost (In Lakhs) Length In Km
Karwar Impts. And asphalting to Kerwadi Katar Nayawada in Karwar Taluk 317.25 1.77
Bhatkal Impt from Hadavalli to Kurndoor Road in Bhatkal Taluk 3.30
Kumta Impts. And asphalting to Anegundi Hebbail road in Kumta Taluk 6.80
Honnavar Impts from Vandoor to Nilkod Road in Honnavar Taluka 3.00
Siddapur Impts. To road joining KNS road to KP road in Siddapur Taluk 5.00
Siddapur Khanapur Talguppa (SH) to Siddapur Jog (MDR) Golgod Hosur in Siddapur Taluk 2.75
Haliyal Impt from Aralwada to Santolli Road Haliyal Taluk 3.30
Yellapur Impts. To Mundwada road connecting karwar-bellary road 3.25
Joida Impts. And asphalting to Akhetta Viranjol road in Joida Taluk 4.80
Karwar Impts to Makkeri Kadwad Madibag road in Karwar Taluk 181.33 4.70
Karwar Impt to Majali, Mudgeri, Asnoti, Chittaluka Road in Karwar Taluk 8.30
Ankola Impts. And asphalting to Shevkar-Dhronagiri road in Ankola Taluk 6.50
Bhatkal Impts to Sarpankatta -Huyilmaddi Road in Bhatkal Taluk 2.65
Honnavar Impts to Jinnod-via Dabbod Adukal Road in Honnavar Taluk 4.00
Mundagod Imp.to road from Mundgod Andalagi to Hanumapur road to join Ummachagi Katur road in Mundgod Taluk 190.57 8.10
Sirsi Imp to road from Kakkalli, Vanalli, Sarnagadde, Sonagimane road in Sirsi Taluk 6.40
Yellapur Imp to Kodlagadde road connecting to NH 63 & MDR in Yallapur Taluk 2.50
Haliyal Impts of Road from Hampihalli to Tattigera in Haliyal Taluk 4.50
689.15 81.62

PMGSY works under taken in 2001-2002

Taluk Name Road Name cost (In Lakhs) Length In Km
Karwar Impt from N.H 17 to Todur Colony in karwar Taluk 181.02 1.50
Karwar Impt from Katar to Gousewada Road in Karwar Taluk 2.31
Ankola Impt from to Mattighatta, Kammani, Halavalli in Ankola Taluk 5.60
Joida Impt from Karatagalli, Wadkarwada, Devanhalli in Joida Taluk 3.70
Joida Impts to Anmod to Castelrock Road in Joida Taluk 1.65
Kumta Impts from Gudkagal to Belehoige Road in Kumta Taluk 137.49 2.10
Honnavar Impts from Kasarkod, Apsarkod to Mankimahadi Road in Honnavar Taluk 1.80
Honnavar Impts from Mahimi Link Road to N.H 206 Road in Honnavar Taluk 3.21
Bhatkal Impt from Hallari, Yelbar to Hadlur Road in Bhatkal Taluka 2.60
Bhatkal Impt from Hallari, Yelbar to Hadlur Road in Bhatkal Taluka 1.59
Siddapur Impts from Vazgar to Hukkeri Road in Siddapur Taluk 184.95 9.50
Sirsi Impts from Sirsi Haveri Road to Rangpur in Sirsi Taluk 2.00
Sirsi Impts from Sirsi Hosakoppa Road to Yesale in Sirsi Taluk 3.20
Sirsi Impts from Sorab Road to Tigani in Sirsi Taluk 2.40
Mundagod Impts from Sirsi Hubli Road to Kalkoppa in Mundgod Taluk 1.25
Mundagod Impts from Sirsi Hubli Road to Majjigari in Mundgod Taluk 1.25
Yellapur Impts from Kundaini to Hemmadi to Boppanalli in Yallapur Taluk 136.54 8.50
Haliyal Impts from Kavalwad to Hosvitmal Road in Haliyal Taluk 2.20
Haliyal Impts from Bhagavati to Balashettykoppa Road in Haliyal Taluk 3.90
Haliyal Impts from Haliyal to Magwad Road in Haliyal Taluk 1.40
Karwar Impts from Mahalewada to Kothor Road in Karwar Taluk 362.74 3.00
Ankola Impts from Hilur to Tingalbail in Ankola Taluk 3.00
Ankola Impts from Mavinkeri to Halvalli in Ankola Taluk 2.70
Kumta Impts from Halvalli to Nillekeri, Naikarkeri, Muroor Road in Kumta Taluk 4.90
Honnavar Impts from Jalvalli to Holebedikeri Road in Honnavar Taluk 2.57
Honnavar Impts from NH 206 to Alanki Road in Honnavar Taluk 1.56
Honnavar Impts from Talamakki Road in Honnavar Taluk 3.43
Bhatkal Impts from Doddbalse in Bhatkal Taluk 1.72
Bhatkal Impts from Melinkerigadde Taligera to Mudshirali in Bhatkal Tq 2.76
Joida Impts from Mange Gokarde, Godshet, Kumbarwada Road in Joida Taluk 1.80
Joida Impts from Paida Road in Joida Taluk 4.40
Sirsi Impts from Padambail Road in Sirsi Taluk 292.52 5.92
Siddapur Impts from Karikai to Adukatta Road in Siddapur Taluk 2.75
Yellapur Impts from Dehalli to Shambumane Road in Yellapur Taluk 4.50
Mundagod Impts from Sirsi Hubli to Ramapur Road in Mundgod Taluk 3.00
Mundagod Impts from Y. B. Road to Chouwdalli Road in Mundgod Taluk 3.00
Mundagod Impts from Jodkatta Road in Mundgod Taluk 4.10
Haliyal Impts from Wada to Rayapattana Road in Haliyal Taluk 4.30
1295.26 119.17

PMGSY works under taken in 2003-2004

Taluk Name Road Name cost (In Lakhs) Length In Km
Karwar Impt from Mallapur to Belur Road in Karwar Tq 142.27 3.00
Honnavar Impt from Sunnakavur L - 63 SH 63 to Belur in Honnavar Tq 1.90
Bhatkal Impt from Sharadahole to Mudshirali in Bhatkal Tq 3.00
Sirsi Impts from Bhasi to Mugavalli Road in Sirsi Tq 152.65 4.00
Sirsi Impts from Sugavi to Gadageri Road in Sirsi Tq. 1.20
Siddapur Impts from Kangod to Ballatte Road in Siddapur 4.00
Siddapur Impts from SH 93 to Arendur in Siddapur Tq. 3.00
Yellapur Impts from S.B Road to Kannenalli Baichod Road in Yellapur Tq. 153.96 2.00
Yellapur Impts from Daugilal, Bommadikoppa - Chimalilal Road in Yellapur Tq 1.80
Mundagod Impts from K.T Road to Maragadi Road in Mundgod Tq 6.50
Haliyal Impts from Tattigera to M.D. Road in Haliyal Tq 2.60
Haliyal Impts from Gadiyal to Amankoppa Road in Haliyal Tq. 4.50

PMGSY works under taken in 2004-2005

Taluk Name Road Name cost (In Lakhs) Length In Km
Ankola Improvements to Kanchinbatti to Kaigadi Road in Ankola Tq 304.7 10.70
Sirsi Improvements to road from Isloor to Bisalkoppa km 12.88 in Sirsi Tq 206.5 10.34
Siddapur Improvements to road N.H to Satodi Road km 8.00 tokm 25.00 in Siddapur Tq 89.66 15.00

PMGSY works under taken in 2005-2006

Taluk Name Road Name cost (In Lakhs) Length In Km
Honnavar Improvements to road from Jankhadkal to NH -206 217.9 7.00

PMGSY works under taken in 2006-2007

Taluk Name Road Name cost (In Lakhs) Length In Km
Joida Improvements to Castalrock Diggi road from Km 9.00 to 30.00 in Joida Tq 790.8 14.20

PMGSY works under taken in 2007-2008

Taluk Name Road Name cost (In Lakhs) Length In Km
Bhatkal Improvements to Road from Nastar to NH-17 146.7 3.61
Bhatkal Improvements to Road from Ulvar to NH-17 816.0 12.71
Honnavar Improvements to Road from Gaddemane to NH-206 416.5 9.69
Honnavar Improvements to Road from Adekekuli to NH-17 635.7 13.38
Honnavar Improvements to Road from Pavinkurva to NH-17 306.7 5.04
Joida Improvements to Road from T 02 to SH 95 (Jagalbet) 705.6 15.45
Karwar Improvements to Road from Bolshitta Katne to Dhol 202.8 3.74
Siddapur Improvements to Road from Lambapur to Bedkani Cross 726.2 17.10
Siddapur Improvements to Road from Heggarani to Sarakuli, Kolagibees Herur road 547.1 12.75
Siddapur Improvements to Road from Hematemane to Kavachur Cross joining SH 93 247.6 6.59
Siddapur Improvements to Road from Hulkatri to Katgal Cross Joining to SH 48 662.1 15.50
Siddapur Improvements to Road from Siddapur Kondli Cross Joining Sorab Bhatkal Road 225.3 5.67
Sirsi Improvements to Road from Vaddinkoppa to Margundi 387.9 7.75
Siddapur Improvements to Road from Yalugar Cross to 16th milestone 1343. 19.50
Sirsi Improvements to Road from Bengle to Banavasi 221.1 5.75

PMGSY works under taken in 2008-2009

Taluk Name Road Name cost (In Lakhs) Length In Km
Sirsi Improvements to Haveri Road to Vaddal Santolli, Kalanagi, Rampur 486.1 11.64
Haliyal Improvements to Road from Guledkoppa to Haliyal-Kalaghatgi Road 309.0 6.70
Honnavar Janna to NH-206 237.2 7.72
Honnavar Hagdekeri to Idagunji-Balkur Road 247.4 6.73
Honnavar Tonka to NH-17 50.40 3.40
Honnavar Talmotekeri to NH-17 185.9 4.88
Honnavar Melinkeri to NH-206 527.8 15.00
Karwar SH - 95 to Ulaga Singudda 203.3 5.50
Karwar NH - 17 to Hydarghat Shejwad 530.5 13.63
Mundgod Nandikatta to Peddar Oni 80.52 1.86
Mundgod Malagi to Ummachagi 340.2 19.43
Mundgod ngalki to PalaRoad 370.4 3.70
Siddapur Hirekangadde to Heenagara Cross 390.2 8.00
Sirsi Madanakeri to Sirsi Sorab Road 486.4 10.73
Sirsi Sonagimane Kalve Nursery Cross to Kalgar 555.3 15.00

PMGSY works under taken in 2009-2010

Taluk Name Road Name cost (In Lakhs) Length In Km
Honnavara Janna to T 03 in Honnavar Tq 273.2 7.72
Honnavara Hegadekeri - T03 247.4 6.73
Honnavara Tonka - T 04 in Honavar Taluk 54.36 3.40
Honnavara Talmotkeri - T04 164.5 4.88
Honnavara melinakeri - T03 in Honnavra Taluk 573.6 15.00
Karwar SH - 95 to Ulaga Singudda in Karwar Tq 203.0 5.50
Karwar NH-17 - Hyderghat Shejwad Road 530.5 12.15
Mundgod Malagi to Ummachagi in Mundagod Tq 625.3 19.43
Mundgod Ingalki to PalaRoad in Mundagod Tq 153.0 3.70
Mundagod Ingalki - Pala Road (Maintenance) 153.0 3.40
Siddapur Hirekaigadde to Heenagara Cross in Siddapur Taluk 347.2 8.00
Sirsi Madanakeri to Sirsi Sorab Road Via Bidralli in Sirsi Taluk. 486.4 10.00
Sirsi Sonagimane Kalve Nursery Cross to Kalgar in Sirsi Taluk. 640.1 15.00

PMGSY works under taken in 2012-2013

Taluk Name Road Name cost (In Lakhs) Length In Km
Sirsi Gummanamane to T-10 in Sirsi Tq 318.1 5.74
Sirsi Melin Uplekoppa to L-148 in Sirsi Tq 237.2 3.93
Sirsi Galladamane to T-08 in Sirsi Tq 267.0 4.13

PMGSY works under taken in 2013-2014

Taluk Name Road Name cost (In Lakhs) Length In Km
Joida castlerrock - diggi 50.00 22

PMGSY works under taken in 2014-2015

Taluk Name Road Name cost (In Lakhs) Length In Km
Joida Bridge Across Castlrock Diggi Road Ch 15.10 KM 74.99 30
Joida Bridge Across Castlrock Diggi Road Ch 21.30 KM 95.20 24 Mts
Joida Bridge Across Castlrock Diggi Road Ch 21.30 KM 95.20 24 Mts

PMGSY works Sanctioned details in 2019-2020

Taluk Name Road Name Total Road Lenght (In Kms) Total Estimated Cost including Maintainance & Renewal (In Lakhs) Total Package Cost Including GST & Misselaneous (In Lakhs) Approximate Package Cost Excluding GST & Misselaneous (In Lakhs)
Sirsi Dasanakoppa to Kandraji via Danaganahalli, Kotekoppa, Ummadi,Bankanal 10.35 949.97 1057.81 959.11
Sirsi Ganeshnagar to Neeranalli Via Andalli 3.12 178.40
Siddapura Hale Bedkani to HalageriAdukatta (MDR)Road via Kumbarakuli,Sunkatti, Sullurkeri 5.98 544.76 1057.81 899.14
Siddapura Mensi -Vandane road to Kudegod via Jigalemane, Karibal, Anagal 4.66 513.05
Siddapura Guntekodlu to Siddapura Talaguppa road via Mandagalale, Nipli, Arendur 9.1 852.11 1315.35 1118.05
Siddapura Koppanakeri to NH via Algod, Tulakalmane cross, Kodagibaile crooss, Mandagalale, Hemtemane 5.2 463.24
Ankola Taribail to Agragone Joog via Bolkunte, Sagadgeri , Bailkeri, Hegre , Totadkeri, Adigone 8.27 587 1073 912.05
Karwar Devalmakki to Soregadde Siddarameshwar temple Via SH-6, Konkangadde,Shirve 6.2 486
Kumta SH 48 to SH 48 via Hegle,Goudgalkoppa,Gowdrukeri,Bachkanda,Kelaginkeri,Kelaginkoppa 5.23 447 1667.50 1417.38
Honnavar Basti to Hesige via neeragai, jinbail , Bettanakeri , Kulgaar , Heggar 7.3 637
Honnavar NH-206 to Kembal , Halli Gatte Road 6.7 583.50
Bhatkal Murudeshwar Harikantrakeri to NH-66 Neeragadde Crossing NH-66 Yedabadru Muragoli Kalika Temple Via Tudalli Village 6.78 635.50 1490.50 1266.93
Bhatkal Bhatkal -Sagar SH Murukodi to Hudir village Primary school Via Hudeel , Gandalagi , Murkodikeri,Marathikeri 11.09 855
Yellapura Kumbri to Upaleshwar 6.52 591.67 1172.36 996.51
Yellapura Tukadbail to Hulagod Via Jogabhattarkeri 5.99 580.69
Mundagod GUNJAVATHI TO UMMACHAGIKATUR ROAD (MDR) 8.5 916.07 1428.58 1214.29
Mundagod Tenkal cross(MDR) to (Mavinakatta)taluka Boundary VIA Ummachagi 5.74 512.51
Haliyal Golehalli to Banasgeri via Joganakoppa 5.87 517.25 726.05 617.14
Haliyal Golehalli to Banasgeri via Joganakoppa Construction of Bridge at ch 5.30 Km Bridge 38mt Lenght 208.80
Joida Godshet to Tellolli via Kumbarwada 6.16 558.55 1082.91 920.47
Haliyal Pala mangalwad to Hunsawad village via Malawad 6.32 524.36
Khanapur Chapagaon-Jalaga To Karambal 7.73 673.79 36.85 97.93
Khanapur Chapoli To SH via jamboti 9.82 634.99 44.62 125.06
Khanapur Hattargunji-Mudewadi-Dukarwadi To SH 5.65 347.72 21.52 68.26
Khanapur Katagali-Modekoppa To SH-31 6.60 388.23 24.41 74.14
Khanapur Katagali-Modekoppa To SH-31 6.60 388.23 24.41 74.14
Kittur Jamalur To Shigihalli Road - 455.17 - -
Kittur Maradingalapur - Tigadi - Chikkabagewadi - 342.2 - -
Kittur Hirenandihalli To Hoskoti - 152 - -
Kittur Ambadgatti - Tegur - Gandigwad - 349.8 - -
Kittur Yarguddi - Bairnatti - Hanumanat - 457.01 - -

PMGSY works Sanctioned details in 2020-2021

Sl No Taluk Name Road Name Length In Km Cost (In Lakhs)
1 Sirsi Vanalli to Dhoranagiri cross via Kardigitti,
Dhorangeri, Hegormane, Mundgemane, Kakkalli
3.67 368.42
2 Sirsi Narebail cross (Sirsi-Hubballi SH) to Gangeri via Vakkalakoppa 4.84 431.07
3 Sirsi Chipagi to Sadashivalli Via Somanalli 3.325 361.82
4 Sirsi MRL28-Vanalli to Dhoranagiri cross via Kardigitti, Dhorangeri, Hegormane, Mundgemane, Kakkalli
Construction of RCC Box type bridge (4m x 3.5m, 4 vent) at ch 8.500 km of MRL28
18 m 142.20
5 Sirsi Narebail cross (SIrsi-Hubballi SH) to Gangeri via Vakkalakoppa
Construction of RCC type bridge (4m x 3.5m, 4 vent) at ch 0.400 km of MRL28
17.95 m 126.64
6 Sirsi Ganeshnagar to Neeranalli Via Andalli
Construction of Long span Bridge At Ganesh Nagar to Neernalli via Andalli road in sirsi Taluka
44.9 m 229.61
7 Sirsi Vanalli to Dhoranagiri cross via Kardigitti, Dhorangeri, Hegormane, Mundgemane, Kakkalli
Construction of Deck slab bridge (8m x 4.5m, 2 vent) at ch 6.600 km of MRL28
18.2 m 121.21
8 Ankola Sunkasal to Kargdhe via Marathikoppa , Kotepal 5.47 386.91
9 Ankola Heggar to Doranagiri Via Shevkar, Nachigadde 13.07 936.89
10 Karwar SH-34 to Kuddegalli Via Baragadde
Construction of New RCC Bridge (10.00 m X 4.50 m X 6 vents) 7.50 m width at 3.51 km
60 m 178.00
11 Karwar Hunasemakki to Machalli Via Acchakanne 4.38 314.19
12 Karwar Kolge to Sonarwada via Kanasgiri, Devalwada MDR, Puditinbag, Gindiwada, Phalewada 4.89 337.09
13 Karwar SH-34 to Kuddegalli Via Baragadde 7.72 566.59
14 Karwar MRL16-SH-34 to Kuddegalli Via Baragadde
Construction of New RCC Bridge (10.00 m X 4.00 m X 2 vents )7.50m width at Ch 4.20 km
20 m 96.89
15 Karwar Hunasemakki to Machalli Via Acchakanne
Construction of New RCC Bridge (8.00 m X 3.00 m X 2 vents) 7.50 m width at Ch 1.00 Km
Construction of New RCC Bridge (10.00 m X 4.00 m X 2 vents )7.50m width at Ch 4.20 km
16 m 66.70
16 Kumta Hositla to VR 546 via Goliteppa, Janathacolony,Gangekolla,Nadumaskeri 4.84 347.47
17 Kumta Kolageri to Algar Via Hegde hosalli,Kannimath,Alagar,Abbolli 4.63 337.77
18 Kumta SH 48 to Marakal Cross via Hottinshirur,Vaddigadde,Hindagone,
Hankal,Guddekeri,Kandavalli,Ajjigadde,Marakal
3.75 338.84
19 Kumta Sandalli muttolli to VR17 via Kattinabena 5.65 404.07
20 Kumta SH 48 to Marakal Cross via Hottinshirur,Vaddigadde,Hindagone,Hankal,Guddekeri,Kandavalli,Ajjigadde,Marakal
(Construction of New RCC Bridge (10.00 M X 3.00 M X 2 vents) 7.50 m width at ch 3.36 Km)
20 m 91.35
21 Honnavara SH to Kavalakki via Hadimane,Melinkeri,Kanakki,Meganmane,, SH Crossing Kerekon,Kontpal,Keremanekachrike,Kasanbena,Halemane 9.54 746.01
22 Honnavara Bajjigeri to Asikeri Via Bajekeri 7.42 635.55
23 Honnavara Basti to Hesige via neeragai , jinbail , Bettanakeri , Kulgaar , Heggar
Construction of LSB ( 10.00 X 3.00 X 2 Vents ) at ch 0.96 Km onMRL32-MDR Basti to Hesige via neerag
20 m 91.96
24 Honnavara Basti to Hesige via neeragai , jinbail , Bettanakeri , Kulgaar , Heggar Construction of LSB ( 10.00 X 4.50 X 2 Vents ) at ch 7.44 Km on MRL32-MDR Basti to Hesige via nee 20 m 95.54
25 Bhatkal Kiruhole Temple cross Road to Shirajjimanekeri cross Road to Joining Gorte Road to Ajjanamanekeri Road Via Gorte , Siddanamanekeri 5.47 386.91
25 Bhatkal Kiruhole Temple cross Road to Shirajjimanekeri cross Road to Joining Gorte Road to Ajjanamanekeri Road Via Gorte , Siddanamanekeri 5.47 386.91
26 Bhatkal Murudeshwar Harikantrakeri to NH-66 Neeragadde Crossing NH-66 Yedabadru Muragoli Kalika Temple Via Tudalli Village
Construction of LSB ( 10.00 X 5.00 X 5 Vents ) at 2.52 km on MRL23-Murudeshwar Harikantrakeri to N
50 m 305.07
27 Yellapura Halasikoppa to (Bharatanhalli) 6.40 547.36
28 Yellapura Linganakoppa-Anejeddi (SH6) to Kolikeri (NH63) 9.60 798.23
29 Mundagod UMMACHAGI-KATUR ROAD TO KAVALAGI 6.35 542.16
30 Mundagod Hittalasara to Kanchi koppa cross 5.50 441.79
31 Haliyal Mangalawad MDR to SH 28 via Tergaon and Magawad 6.00 509.29
32 Haliyal Hunsawad to taluk border via Satnalli and Arlawad 6.00 509.29
33 Haliyal Arlwad Via Dusagi and Janata plot in Haliyal taluk 6.75 541.58
34 Haliyal Chibbalgeri MDR to Kumbarkoppa via Khmadolli, Siddapur 5.00 412.84
35 Haliyal Gutti to Audit no 3 via Ambikanagar 4.40 383.27
36 Haliyal Bantargali road to kavalwada via Sankankoppa 3.25 276.11
37 Haliyal Bantargali road to kavalwada via Sankankoppa
Construction of Bridge at Ch 1.00 km
67.2 m 448.31
38 Joida Chandewadi road to Loharwada via Konshet 5.25 464.28
39 Joida Castle rock MDR to Bazarkunang via tadaki 14.46 1063.60
Total 165.18 15194.57

PMGSY works Sanctioned details in 2022-2023

Sl No ಕಾಮಗಾರಿ ಹೆಸರು ಮಂಜೂರಾದ ಉದ್ದ (ಕಿ.ಮೀ.ಗಳಲ್ಲಿ ) ಅಂದಾಜು ಮೊತ್ತ (ರೂ.ಲಕ್ಷಗಳಲ್ಲಿ ಮುಗಿದ ಉದ್ದ (ಕಿ.ಮೀ.ಗಳಲ್ಲಿ ) ಮುಗಿದ ದಿನಾಂಕ ಷರಾ
ಶಿರಸಿ ತಾಲೂಕು
ಎಂ ಆರ್ ಎಲ್ ೨೬ ದಾಸನಕೊಪ್ಪ ದಿಂದ ಕಂದ್ರಾಜಿ ವಾಯ ದನಗನಹಳ್ಳಿ, ಕೋಟೆಕೊಪ್ಪ, ಉಮ್ಮಾಡಿ-ಬಂಕನಾಳ ೧೦.೩೫ ೯೪೯.೯೭ ೯.೭೯ ೩೧-೧೨-೨೦೨೧ ೦.೫೬ ಕಿ.ಮೀ ಉದ್ದವನ್ನು ಕೈಬಿಡಲಾಗಿದೆ.
ಎಂ ಆರ್ ಎಲ್ ೦೨-ಗಣೇಶನಗರದಿಂದ ನರ‍್ನಳ್ಳಿ ವಾಯಾ ಅಂಡಳ್ಳಿ ೩.೧೧೫ ೧೭೮.೪೧ ೩.೦೩೫ ೦೧-೦೩-೨೦೨೧ ೦.೦೮೦ ಕಿ.ಮೀ ಉದ್ದವನ್ನು ಕೈಬಿಡಲಾಗಿದೆ.
ಎಂಆರ್‌ಎಲ್೩೦ ವಾನಳ್ಳಿಯಿಂದ ಅಂಕೋಲಾ ತಾಲೂಕಾ ಬಾರ್ಡರ್ ವಾಯಾ ಮುಸ್ಕಿ, ನಾಚಿಗದ್ದೆ ರಸ್ತೆ ೧೨.೭೧ ೧೪೭೭.೪೭ ೫.೦೦ - ಕಾಮಗಾರಿ ಪ್ರಗತಿಯಲ್ಲಿದೆ.
ಎಂ ಆರ್ ಎಲ್ ೨೮ - ವಾನಳ್ಳಿಯಿಂದ ದ್ರೋಣಗೇರಿ ಕ್ರಾಸ ಕರಡಿಗಟ್ಟಿ, ದ್ರೋಣಗೇರಿ, ಹೆಗೋರಮನೆ, ಮುಂಡಗೆಮನೆ, ಕಕ್ಕಳ್ಳಿ ೩.೬೭೦ ೩೬೮.೪೦ ೩.೪೮ ೩೧-೧೨-೨೦೨೨ ೦.೧೯ ಕಿ.ಮೀ ಉದ್ದವನ್ನು ಕೈಬಿಡಲಾಗಿದೆ.
ಎಂ ಆರ್ ಎಲ್ ೨೯-ನರೇಬೈಲ್ ಕ್ರಾಸದಿಂದ (ಶಿರಸಿ-ಹುಬ್ಬಳ್ಳಿ ಎಸ್ ಹೆಚ್) ಗಣಗೇರಿ ವಾಯಾ ವಕ್ಕಲಕೊಪ್ಪ ೪.೮೪೦ ೪೩೦.೩೦ ೪.೮೪ ೩೧-೧೨-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ
ಎಂ ಆರ್ ಎಲ್ ೦೧ - ಚಿಪಗಿಯಿಂದ ಸದಾಶಿವಳ್ಳಿ ವಾಯಾ ಸೋಮನಳ್ಳಿ ೩.೩೨೫ ೩೬೧.೭೦ ೩.೩೩ ೩೧-೧೨-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ
ಎಂ ಆರ್ ಎಲ್ ೨೮ - ವಾನಳ್ಳಿಯಿಂದ ದ್ರೋಣಗೇರಿ ಕ್ರಾಸ ಕರಡಿಗಟ್ಟಿ, ದ್ರೋಣಗೇರಿ, ಹೆಗೋರಮನೆ, ಮುಂಡಗೆಮನೆ, ಕಕ್ಕಳ್ಳಿ ಸೇತುವೆ (೪x೩.೫x೪ ಗಿeಟಿಣ೮.೫೦ಕಿ.ಮೀ) ೧೮ಮೀ ೧೧೧.೩೦ ೦.೦೦ ೩೧-೧೨-೨೦೨೨ ಸೇತುವೆ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
ಎಂ ಆರ್ ಎಲ್ ೨೯ - ನರೇಬೈಲ್ ಕ್ರಾಸ (ಶಿರಸಿ-ಹುಬ್ಬಳ್ಳಿ ಎಸ್ ಹೆಚ್)ದಿಂದ ಗಣಗೇರಿ ವಾಯಾ ವಕ್ಕಲಕೊಪ್ಪ ಸೇತುವೆ (೪x೩.೫x೪ ಗಿeಟಿಣ ೦.೪೦ಕಿ.ಮೀ) ೧೭.೯೫ಮೀ ೬೮.೦೦ ೦.೦೦ ೩೧-೧೨-೨೦೨೨ ಸೇತುವೆ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
ಎಂ ಆರ್ ಎಲ್ ೦೨ - ಗಣೇಶನಗರದಿಂದ ನೀರನಳ್ಳಿ ವಾಯಾ ಅಂಡಳ್ಳಿ ಸೇತುವೆ ೪೪.೯ ಮೀ ೨೨೮.೦೦ ೦.೦೦ ೩೧-೧೨-೨೦೨೨ ಸೇತುವೆ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೧೦ ಎಂ ಆರ್ ಎಲ್ ೨೮ - ವಾನಳ್ಳಿಯಿಂದ ದ್ರೋಣಗೇರಿ ಕ್ರಾಸ ಕರಡಿಗಟ್ಟಿ, ದ್ರೋಣಗೇರಿ, ಹೆಗೋರಮನೆ, ಮುಂಡಗೆಮನೆ, ಕಕ್ಕಳ್ಳಿ ಸೇತುವೆ (೮x೪.೫x೨ಗಿeಟಿಣ ೬.೬೦ಕಿ.ಮೀ) ೧೮.೨ ಮೀ ೧೨೧.೨೧ ೦.೦೦ - ಕಾಮಗಾರಿ ಪ್ರಗತಿಯಲ್ಲಿದೆ
ಒಟ್ಟೂ ೩೮.೦೧೦ ೩೭೬೬.೨೫೦ ೨೯.೪೭೦
ಸಿದ್ಧಾಪುರ ತಾಲೂಕು
೧೧ ಎಂ ಆರ್ ಎಲ್ ೦೫ ಹಳೆ ಬೇಡ್ಕಣಿಯಿಂದ ಹಲಗೇರಿ-ಆಡುಕಟ್ಟಾ (ಎಂ.ಡಿ.ಆರ್) ರಸ್ತೆ ವಾಯಾ ಕುಂಬಾರಕುಳಿ, ಸುಂಕಟ್ಟಿ, ಸುಳ್ಳುಕೇರಿ ೫.೯೮ ೫೪೩.೬೫ ೫.೫೦ ೦೨-೦೮-೨೦೨೧ ೦.೪೮೦ ಕಿ.ಮೀ ಉದ್ದವನ್ನು ಕೈಬಿಡಲಾಗಿದೆ.
೧೨ ಎಂ ಆರ್ ಎಲ್ ೦೮ ಮೆಣಸಿ-ವಂದಾನೆ ರಸ್ತೆಯಿಂದ ಕುಡೆಗೊಡ ವಾಯಾ ಜಿಗಲಮನೆ, ಕರಿಬಾಳ, ಆನಗಲ್ ೪.೬೬ ೫೧೩.೦೦ ೪.೬೬ ೦೨-೦೮-೨೦೨೧ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೧೩ ಎಂಆರ್‌ಎಲ್ ೦೨-ಗುಂಟೆಕೊಡ್ಲುದಿAದ ಸಿದ್ದಾಪುರ-ತಾಳಗುಪ್ಪ ರಸ್ತೆ ವಾಯ ಮಂಡಗಲೆಲೆ,ನಿಪ್ಲಿ, ಅರೆಂದೂರು ೯.೧ ೮೫೨.೧೧ ೯.೦೬ ೩೧-೧೨-೨೦೨೧ ೦.೦೪೦ ಕಿ.ಮೀ ಉದ್ದವನ್ನು ಕೈಬಿಡಲಾಗಿದೆ.
೧೪ ಎಂ ಆರ್ ಎಲ್ ೦೭-ಕೊಪ್ಪನಕೇರಿಯಿಂದ ಎನ್.ಹೆಚ್ ವಾಯಾ ಅಲಗೊಡ, ತುಲಕಲಮನೆ ಕ್ರಾಸ್, ಕೊಡಗಿಬೈಲ್ ಕ್ರಾಸ್, ಮಂಡಗಲೆಲೆ, ಹೆಮ್ಮಾಡಿ ೫.೨ ೪೬೩.೨೪ ೫.೧೯ ೩೧-೧೨-೨೦೨೧ ೦.೦೧೦ ಕಿ.ಮೀ ಉದ್ದವನ್ನು ಕೈಬಿಡಲಾಗಿದೆ.
ಒಟ್ಟೂ ೨೪.೯೪೦ ೨೩೭೨.೦೦೦ ೨೪.೪೦೭
ಕಾರವಾರ ತಾಲೂಕು
೧೫ ಎಂಆರ್‌ಎಲ್ ೦೫ದೇವಳಮಕ್ಕಿಯಿಂದ ಸೋರೆಗದ್ದೆ ಸಿದ್ಧರಾಮೇಶ್ವರ ದೇವಸ್ಥಾನ ವಾಯಾ ಎಸ್ ಹೆಚ್-೦೬ ಕೊಂಕಣಗದ್ದೆ ಶೀರ್ವೆ ೬.೨ ೪೩೫.೦೪ ೪.೫೫ ೩೧-೦೫-೨೦೨೨ ೧.೬೪೬ ಕಿ.ಮೀ ಉದ್ದವನ್ನು ಕೈಬಿಡಲಾಗಿದೆ.
೧೬ ಎಮ್‌ಆರ್‌ಎಲ್ ೦೯-ಹುಣೇಸೇಮಕ್ಕಿಯಿಂದ ಮಚ್ಚಳ್ಳಿ ವಾಯಾ ಅಚ್ಚಕನ್ನೆಮನೆ ೪.೩೮೦ ೩೧೪.೨೦ ೧.೭೧ - ಕಾಮಗಾರಿ ಪ್ರಗತಿಯಲ್ಲಿದೆ.
೧೭ ಎಮ್‌ಆರ್‌ಎಲ್ ೧೭ ಕೋಳಗೆಯಿಂದ ಸೋನಾರವಾಡ ವಾಯಾ ಕನಸಗೇರಿ, ದೇವಲವಾಡಾ ಎಚಿಡಿ.ಆರ್, ಪುಡಿತ್ತಿನಭಾಗ, ಗಿಂಡಿವಾಡಾ, ಪಹಳೆವಾಡಾ ೪.೮೯೦ ೩೩೭.೦೮ ೪.೨೭ - ಕಾಮಗಾರಿ ಪ್ರಗತಿಯಲ್ಲಿದೆ.
೧೮ ಎಮ್‌ಆರ್‌ಎಲ್ ೧೬ ಎಸ್ ಹೆಚ್ ೩೪ ದಿಂದ ಕÀÄಡ್ಡೇಗಳ್ಳಿ ೭.೭೨೦ ೫೬೬.೫೬ ೦.೦೦ - ೭.೭೨ ಕಿ.ಮೀ ಅರಣ್ಯ ಸಮಸ್ಯೆಯಿಂದ ಬಾಕಿ ಇರುತ್ತದೆ
೧೯ ಎಮ್‌ಆರ್‌ಎಲ್ ೧೬-ಎಸ್ ಹೆಚ್ ೩೪ ದಿಂದ ಕುಡ್ಡೇಗಳ್ಳಿ ವಾಯಾ ಬರಗದ್ದೆ ಸೇತುವೆ (೧೦x೪.೫x೬ ಗಿeಟಿಣ ೩.೫೧ಕಿ.ಮೀ) ೬೦ಮೀ ೧೭೮.೦೦ ೦.೦೦ ೨೩-೦೪-೨೦೨೨ ಸೇತುವೆ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೨೦ ಎಮ್‌ಆರ್‌ಎಲ್ ೧೬-ಎಸ್ ಹೆಚ್ ೩೪ ದಿಂದ ಕುಡ್ಡೇಗಳ್ಳಿ ವಾಯಾ ಬರಗದ್ದೆ ಸೇತುವೆ (೧೦x೪x೨ ಗಿeಟಿಣ ೪.೨೦ಕಿ.ಮೀ) ೨೦ಮೀ ೯೫.೩೦ ೦.೦೦ ೦೩-೧೧-೨೦೨೨ ಸೇತುವೆ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೨೧ ಎಮ್‌ಆರ್‌ಎಲ್ ೦೯ ಹುಣೇಸೇಮಕ್ಕಿಯಿಂದ ಮಚ್ಚಳ್ಳಿ ವಾಯಾ ಅಚ್ಚಕನ್ನೆಮನೆ ಸೇತುವೆ (೮x೩x೨ ಗಿeಟಿಣ ೧.೦೦ಕಿ.ಮೀ) ೧೬ಮೀ ೬೬.೭೦ ೦.೦೦ - ಕಾಮಗಾರಿ ಕೈಬಿಡಲಾಗಿದೆ
ಒಟ್ಟೂ ೨೩.೧೯೦ ೧೯೯೨.೮೮ ೧೦.೫೩
ಹೊನ್ನಾವರ ತಾಲೂಕು
೨೨ ಎಂ ಆರ್ ಎಲ್ ೩೨ ಎಂ ಡಿ ಆರ್ ಬಸ್ತಿಯಿಂದ ಹೇಸಿಗೆ ವಾಯಾ ನೀರಗಲ್, ಜಿನಬೈಲ್, ಬೆಟ್ಟನಕೇರಿ, ಕುಳಗಾರ್ ಹೆಗ್ಗಾರ ೭.೩ ೬೦೮.೪೨ ೭.೩೦ ೨೦-೦೨-೨೦೨೩ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೨೩ ಎಂ ಆರ್ ಎಲ್ ೨೪ ಎನ್.ಹೆಚ್-೨೦೬ ದಿಂದ ಕೆಂಬಾಲ್, ಹಳ್ಳಿಗಟ್ಟಿ ೬.೭ ೫೪೩.೦೫ ೬.೭೦ ೨೦-೦೨-೨೦೨೩ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೨೪ ಎಮ್‌ಆರ್‌ಎಲ್ ೦೬-ಎಸ ಹೆಚ್ ದಿಂದ ಕವಲಕ್ಕಿ ವಾಯಾ ಹಾದಿಮನೆ, ಮೇಲಿನಕೇರಿ, ಕಾನಕ್ಕಿ, ಮೆಗ್ಗನಮನೆ, ಎಸ್ ಹೆಚ್ ಕೂಡು ರಸ್ತೆ ಕೆರೆಕೋಣ, ಕೊಂತಪಾಲ್, ಕೆರೆಮನೆಕಚ್ರಿಕೆ,ಕಸನಬೇಣ, ಹಳೆಮನೆ ೯.೫೪೦ ೭೪೬.೦೧ ೯.೫೪ ೨೬-೧೨-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೨೫ ಎಮ್‌ಆರ್‌ಎಲ್ ೨೩-ಬಜ್ಜಿಕೇರಿಯಿಂದ ಅಸಿಕೇರಿ ೭.೪೨೦ ೬೩೫.೫೪ ೭.೪೨ ೨೦-೦೨-೨೦೨೩ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ
೨೬ ಎಮ್‌ಆರ್‌ಎಲ್ ೩೨-ಬಸ್ತಿಯಿಂದ ಹೇಸಿಗೆವಾಯಾ ನೀರಗಾಯಿ, ಜಿನಬೈಲ್, ಬೆಟ್ಟನಕೇರಿ, ಕೂಲಗಾರ್, ಹೆಗ್ಗಾರ ಸೇತುವೆ (೧೦x೩x೨ ಗಿeಟಿಣ ೦.೯೬ಕಿ.ಮೀ) ೨೦ಮೀ ೮೮.೫೦ ೦.೦೦ ೨೬-೧೨-೨೦೨೨ ಸೇತುವೆ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೨೭ ಎಮ್‌ಆರ್‌ಎಲ್ ೩೨-ಬಸ್ತಿಯಿಂದ ಹೇಸಿಗೆವಾಯಾ ನೀರಗಾಯಿ, ಜಿನಬೈಲ್, ಬೆಟ್ಟನಕೇರಿ, ಕೂಲU್ಫರ್, ಹೆಗ್ಗಾರ ಸೇತುವೆ (೧೦x೪.೫x೨ ಗಿeಟಿಣ ೭.೪೪ಕಿ.ಮೀ) ೨೦ಮೀ ೯೨.೧೦ ೦.೦೦ ೨೮-೦೪-೨೦೨೩ ಸೇತುವೆ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
ಒಟ್ಟೂ ೩೦.೯೬೦ ೨೭೧೩.೬೨೦ ೩೦.೯೬೪
ಭಟ್ಕಳ ತಾಲೂಕು
೨೮ ಎಂ ಆರ್ ಎಲ್ ೨೩ ಮುರ್ಡೆಶ್ವರ ಹರಿಕಂತ್ರಕೇರಿಯಿAದ ಎನ್.ಹೆಚ್-೬೬ ನೀರಗದ್ದೆ, ಕ್ರಾಸಿಂಗ್ ಎನ್.ಹೆಚ್-೬೬ ಎಡಬದ್ರು ಮುರಗೊಳ್ಳಿ ಕಾಳಿಕಾ ದೇವಸ್ಥಾನ ವಾಯಾ ತುದಳ್ಳಿ ಗ್ರಾಮ ೬.೭೮ ೫೯೫.೧೨ ೬.೭೮ ೩೧-೦೫-೨೦೨೩ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೨೯ ಎಂ ಆರ್ ಎಲ್ ೨೧ ಭಟ್ಕಳ-ಸಾಗರ ಎಸ್ ಹೆಚ್ ಮುರಕೋಡಿಯಿಂದ ಹುಡೀಲ್ ಗ್ರಾಮ ಪ್ರೆöÊಮರಿ ಶಾಲೆ ವಾಯಾ ಹುಡೀಲ್, ಗಂಡಿಗಲ್, ಮುರ್ಕೋಢಿಕೇರಿ, ಮರಾಠಿಕೇರಿ ೧೧.೦೯ ೭೭೮.೫೭ ೧೧.೦೯ ೩೧-೦೫-೨೦೨೩ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೩೦ ಎಮ್‌ಆರ್‌ಎಲ್ ೨೪-ಕಿರುಹೊಳೆ ದೇವಸ್ಥಾನದಿಂದ ಶಿರಜ್ಜಿಮನೆ ಕೇರಿ ಕ್ರಾಸ್ ರಸ್ತೆದಿಂದ ಗೊರಟೆ ಕೂಡು ರಸ್ತೆದಿಂದ ಅಜ್ಜನಮನೆಕೇರಿ ರಸ್ತೆ ವಾಯಾ ಗೊರಟೆ, ಸಿದ್ದನಮನೆಕೇರಿ ೪.೦೮೦ ೩೪೦.೦೦ ೪.೦೮ ೩೦-೦೬-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ
೩೧ ಎಮ್‌ಆರ್‌ಎಲ್ ೨೩-ಮುರ್ಡೆಶ್ವರ ಹರಿಕಂತ್ರಕೇರಿದಿAದ ಎನ್.ಹೆಚ್-೬೬ ನೀರಗದ್ದೆ ಕ್ರಾಸ್ ಎನ್.ಹೆಚ್-೬೬ ಯೆಡಬದ್ರು ಮುರಗೋಲಿ ಕಾಳಿಕಾ ದೇವಸ್ಥಾನ ವಾಯಾ ತುದಳ್ಳಿ ಹಳ್ಳಿ ಸೇತುವೆ ಕಾಮಗಾರಿ (೧೦x೫x೫ veಟಿಣs ೨.೫೨ಕಿ.ಮೀ) ೫೦ಮೀ ೨೯೮.೭೦ ೦.೦೦ ೩೦-೦೬-೨೦೨೨ ಸೇತುವೆ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
ಒಟ್ಟೂ ೨೧.೯೫೦ ೨೦೧೨.೩೯ ೨೧.೯೫
ಯಲ್ಲಾಪುರ ತಾಲೂಕು
೩೨ ಎಂ ಆರ್ ಎಲ್ ೦೮ ಕುಂಬಾರಿಯಿAದ ಉಪಳೇಶ್ವರ ೬.೫೨ ೫೯೧.೬೮ ೬.೫೨ ೩೦-೦೩-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೩೩ ಎಂ ಆರ್ ಎಲ್ ೯೬ ತೂಕದಬೈಲ್ ಹುಲಗೋಡ ವಾಯ ಜೋಗಭಟ್ಟರಕೇರಿ ೫.೯೯ ೫೮೦.೭೦ ೫.೯೯ ೩೦-೦೩-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೩೪ ಎಮ್‌ಆರ್‌ಎಲ್ ೧೬- ಹಲಸಿನಕೊಪ್ಪದಿಂದ ಎಂಡಿಆರ್ (ಭರತನಹಳ್ಳಿ) ೬.೪೦೦ ೫೪೭.೩೫ ೬.೪೦ ೨೮-೦೩-೨೦೨೩ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೩೫ ಎಮ್‌ಆರ್‌ಎಲ್ ೦೫-ಲಿಂಗನಕೊಪ್ಪ-ಆನೆಜಡ್ಡಿ (ಎಸ್ ಹೆಚ್ ೬) ದಿಂದ ಕೋಲಿಕೇರಿ (ಎನ್.ಹೆಚ್ ೬೩) ೯.೬೦೦ ೭೯೭.೨೮ ೯.೬೦ ೨೮-೦೩-೨೦೨೩ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
ಒಟ್ಟೂ ೨೮.೫೧೦ ೨೫೧೭.೦೧೦ ೨೮.೫೧೦
ಮುಂಡಗೊಡ ತಾಲೂಕು
೩೬ ಎಂ ಆರ್ ಎಲ್ ೨೫ ಗುಂಜಾವತಿಯಿAದ ಉಮ್ಮಚಗಿ -ಕಾತೂರ್ ರಸ್ತೆ (ಎಂ.ಡಿ.ಆರ್) ೮.೫ ೯೧೬.೦೭ ೮.೫೦ ೩೦-೦೩-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೩೭ ಎಂ ಆರ್ ಎಲ್ ೧೮ ತೆಂಕಾಲ್ ಕ್ರಾಸ (ಎಂಡಿಆರ್) ದಿಂದ (ಮಾವಿನಕಟ್ಟಾ) ತಾಲೂಕಾ ಬಾರ್ಡರ್ ವಾÀಯಾ ಉಮ್ಮಚಗಿ ೫.೭೪ ೫೧೨.೫೧ ೫.೭೪ ೩೦-೦೩-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೩೮ ಎಮ್‌ಆರ್‌ಎಲ್ ೨೩ -ಉಮ್ಮಚಗಿ-ಕಾತೂರ್ ರಸ್ತೆ(ಎಂಡಿಆರ್) ದಿಂದ ಕಾವಲಗಿ ೬.೩೫೦ ೫೪೦.೫೨ ೧.೫೦ ಕಾಮಗಾರಿ ಪ್ರಗತಿಯಲ್ಲಿದೆ.
೩೯ ಎಮ್‌ಆರ್‌ಎಲ್ ೨೦ -ಹಿತ್ತಲಸರದಿಂದ ಕಂಚಿಕೊಪ್ಪ ೫.೫೦೦ ೪೪೧.೭೪ ೫.೫೦ ೩೦-೧೨-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
ಒಟ್ಟೂ ೨೬.೦೯೦ ೨೪೧೦.೮೪೦ ೨೧.೨೪೦
ಹಳಿಯಾಳ ತಾಲೂಕು
೪೦ ಎಂ ಆರ್ ಎಲ್ ೧೬ ಗೋಲೆಹಳ್ಳಿಯಿಂದ ಬಾಣಸಗೇರಿ ವಾಯಾ ಜೋಗನಕೊಪ್ಪ ೫.೮೭ ೫೧೭.೨೫ ೫.೮೭ ೩೦-೦೩-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೪೧ ಎಂಆರ್‌ಎಲ್ ೧೬ ಗೋಲೆಹಳ್ಳಿಯಿಂದ ಬಾಣಸಗೇರಿ ವಾಯಾ ಜೋಗನಕೊಪ್ಪ ಬ್ರಿಡ್ಜ ಃಡಿiಜge ೩೮.೨mಣ ಐeಟಿgಣh ೨೦೮.೮೨ ೦.೦೦ ೩೦-೦೩-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೪೨ ಎಂಆರ್‌ಎಲ್ ೧೯ ಪಾಳಾ ಮಂಗಲವಾಡಾದಿAದ ಹುಣಸವಾಡಾ ಹಳ್ಳಿ ವಾಯಾ ಮಾಲವಾಡಾ ೬.೩೨ ೫೨೪.೩೭ ೬.೩೨ ೩೧-೦೩-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೪೩ ಎಮ್‌ಆರ್‌ಎಲ್೨೨- ಎಸ್‌ಎಚ್-೯೩ ದಿಂದ ಅರಲವಾಡಾ ವಾಯಾ ದುಸಗಿ ಮತ್ತು ಜನತಾ ಪ್ಲಾಠ್ ೬.೭೫೦ ೫೪೧.೫೭ ೬.೭೫ ೨೮-೦೭-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೪೪ ಎಮ್‌ಆರ್‌ಎಲ್೧೭- ಮಂಗಲವಾಡಾ- ಎಂ.ಡಿ.ಆರ್ÀದಿAದ ಎಸ್.ಹೆಚ್-೨೮ ತೇರಗಾಂವ ಮತ್ತು ಮಾಗವಾಡಾ ೬.೦೦೦ ೫೦೯.೨೭ ೬.೦೦ ೨೮-೧೨-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೪೫ ಎಮ್‌ಆರ್‌ಎಲ್ ೧೮- ಹುಣಸವಾಡಾದಿಂದ ತಾಲೂಕಾ ಬಾರ್ಡರ್ ವಾಯಾ ಸಾತನಳ್ಳಿ ಮತ್ತು ಅರಲವಾಡಾ ೪.೯೪೦ ೩೬೭.೭೫ ೪.೯೪ ೨೮-೧೨-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೪೬ ಎಮ್‌ಆರ್‌ಎಲ್ ೨೪- ಚಿಬ್ಬಲಗೇರಿ ಎಂ.ಡಿ.ಆರ್ÀದಿAದ ಕುಂಬಾರಕೊಪ್ಪ ವಾಯಾ ಖಮದೊಳ್ಳಿ, ಸಿದ್ದಾಪುರ ೫.೦೦೦ ೪೧೨.೮೧ ೫.೦೦ ೨೮-೧೨-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೪೭ ಎಮ್‌ಆರ್‌ಎಲ್೧೧- ಗುತ್ತಿಯಿಂದ ಆಡಿಟ್ ನಂ-೩ ವಾಯಾ ಅಂಬಿಕಾನಗರ ೪.೪೦೦ ೩೮೩.೨೨ ೪.೪೦ ೧೫-೧೨-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೪೮ ಎಮ್‌ಆರ್‌ಎಲ್ ೨೫-ಬಂಟರಗಾಳಿ ರಸ್ತೆಯಿಂದ ಕಾವಲವಾಡಾ ವಾಯಾ ಸಂಕನಕೊಪ್ಪ ೩.೨೫೦ ೨೭೬.೧೧ ೦.೦೦ - ಕಾಮಗಾರಿ ಪ್ರಗತಿಯಲ್ಲಿದೆ.
೪೯ ಎಮ್‌ಆರ್‌ಎಲ್ ೨೫ - ಬಂಟರಗಾಳಿ ರಸ್ತೆಯಿಂದ ಕಾವಲವಾಡಾ ವಾಯಾ ಸಂಕನಕೊಪ ಸೇತುವೆ (೧.೦೦ ಕಿ.ಮೀ) ೬೭.೨ಮೀ ೪೪೮.೩೧ ೦.೦೦ ಸೇತುವೆ ಕಾಮಗಾರಿ ಪ್ರಗತಿಯಲ್ಲಿದೆ
ಒಟ್ಟೂ ೪೨.೫೩೦ ೪೧೮೯.೪೮೦ ೩೯.೨೮೦
ಜೋಯಿಡಾ ತಾಲೂಕು
೫೦ ಎಂಆರ್‌ಎಲ್ ೧೮ ಗೋಡಸೇಟ್ ದಿಂದ ತೆಲ್ಲೊಲ್ಲಿ ವಾಯಾ ಕುಂಬಾರವಾಡಾ ೬.೧೬ ೫೫೮.೫೫ ೪.೩೮ - ಅರಣ್ಯ ಇಲಾಖೆ ಸಮಸ್ಯೆಯಿಂದ ೧.೭೮ ಕಿ.ಮೀ ಕಾಮಗಾರಿ ಬಾಕಿ ಇರುತ್ತದೆ.
೫೧ ಎಮ್‌ಆರ್‌ಎಲ್ ೧೭-ಚಾಂದೇವಾಡಿ ರಸ್ತೆಯಿಂದ ಲೋಹರವಾಡ ೫.೨೫೦ ೪೬೪.೨೮ ೧.೯೦ ಕಾಮಗಾರಿ ಪ್ರಗತಿಯಲ್ಲಿದೆ.
೫೨ ಎಮ್‌ಆರ್‌ಎಲ್ ೧೬- ಕ್ಯಾಸಲರಾಕ್ ಎಂಡಿಆರ್ ದಿಂದ ಬಜಾರಕುಣಂಗ ವಾಯಾ ತಡಕಿ ೧೪.೪೬೦ ೧೦೬೩.೬೦ ೧೩.೭೩ ಕಾಮಗಾರಿ ಪ್ರಗತಿಯಲ್ಲಿದೆ.
ಒಟ್ಟೂ ೨೫.೮೭೦ ೨೦೮೬.೪೩೦ ೨೦.೦೧೦
ಅಂಕೋಲಾ ತಾಲೂಕು
೫೩ ಎಂಆರ್‌ಎಲ್ ೧೬ ತಾರಿಬೈಲದಿಂದ ಅಗ್ರಗೋಣ ಜುಗಾ ವಾಯಾ ಬೋಳಕುಂಟೆ, ಸಗಡಗೇರಿ, ಬೈಲಕೇರಿ, ಹೆಗ್ರೆ, ತೋಟದಕೇರಿ, ಅಡಿಗೋಣ ೮.೨೭ ೫೧೨.೬೮ ೬.೪೧ ೧೫-೧೨-೨೦೨೧ ೧.೮೬೬ ಕಿ.ಮೀ ಉದ್ದವನ್ನು ಕೈಬಿಡಲಾಗಿದೆ.
೫೪ ಎಮ್‌ಆರ್‌ಎಲ್ ೨೦ ಎನ್.ಹೆಚ್-೬೩ ಸುಂಕಸಾಳದಿAದ ಕರಗದ್ದೆ ವಾಯಾ ಮರಾಠಿಕೊಪ್ಪ, ಕೋಟೇಪಾಲ ೫.೪೭೦ ೩೮೬.೯೧ ೫.೪೭ ೩೦-೧೨-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ
೫೫ ಎಮ್‌ಆರ್‌ಎಲ್ ೨೧ ಹೆಗ್ಗಾರದಿಂದ ದ್ರೋಣಗೇರಿ ವಾಯಾ ಶೇವಕಾರ, ನಾಚಿಗದ್ದೆ ೦.೦೦ - ಅಲೈನಮೆಂಟ್ ಬದಲಾವಣೆಯಿಂದ ಕಾಮಗಾರಿ ಕೈಬಿಡಲಾಗಿದೆ
ಒಟ್ಟೂ ೧೩.೭೪೦ ೮೯೯.೫೯೦ ೧೧.೮೮೦
ಕುಮಟಾ ತಾಲೂಕು
೫೬ ಎಂ ಆರ್ ಎಲ್ ೦೧ ಎಸ್ ಹೆಚ್ ೪೮ ದಿಂದ ಎಸ್ ಹೆಚ್ ೪೮ ವಾಯಾ ಹೆಗಲೆ, ಗೌಡಗಲಕೊಪ್ಪ, ಗೌಡರಕೇರಿ, ಬಚಕಂಡ, ಕೆಳಗಿನಕೇರಿ, ಕೆಳಗಿನಕೊಪ್ಪ ೫.೨೩ ೪೧೫.೧೩ ೫.೨೩ ೩೧-೦೫-೨೦೨೨ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
೫೭ ಎಮ್‌ಆರ್‌ಎಲ್ ೦೬-ಹೊಸಹಿತ್ಲದಿಂದ ವಿ ಆರ್ ೫೪೬ ವಾಯಾ ಗೊಲಿತೆಪ್ಪ, ಜನತಾಕಾಲೋನಿ, ಗಂಗೆಕೊಳ್ಳ, ನಾಡುಮಾಸ್ಕೇರಿ ೪.೮೪೦ ೩೪೭.೪೭ ೪.೫೨ ೨೦-೦೨-೨೦೨೩ ೦.೩೧೯ ಕಿ.ಮೀ ಉದ್ದವನ್ನು ಕೈಬಿಡಲಾಗಿದೆ.
೫೮ ಎಮ್‌ಆರ್‌ಎಲ್ ೧೭- ಕೊಲಗೆರೆಯಿಂದ ಅಲಗಾರ ವಾಯಾ ಹೆಗಡೆ ಹೊಸಳಿ, ಕಣ್ಣಿಮಠ, ಅಲಗಾರ, ಅಬ್ಬೋಳ್ಳಿ ೪.೬೩೦ ೩೩೭.೭೭ ೪.೬೩ ೨೦-೦೨-೨೦೨೩ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ
೫೯ ಎಮ್‌ಆರ್‌ಎಲ್ ೦೨ ಎಸ್ ಹೆಚ್-೪೮ ದಿಂದ ಮರಾಕಲ್ ಕ್ರಾಸ ವಾಯಾ ಹೊಟ್ಟಿನಶಿರೂರ್, ವಡ್ಡಿಗದ್ದೆ, ಹಿಂಡಗೋಣ, ಹಣಕಲ್, ಗುಡ್ಡೇಕೇರಿ, ಕಂಡವಳ್ಳಿ, ಅಜ್ಜಿಗದ್ದೆ ಮರಾಕಲ್ ೪.೫೬೦ ೩೩೮.೮೩ ೫.೦೧ ೨೦-೦೨-೨೦೨೩ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ
೬೦ ಎಮ್‌ಆರ್‌ಎಲ್ ೦೩-ಸಂಡಳ್ಳಿ, ಮುಟ್ಟಳ್ಳಿ ಯಿಂದ ಕಟ್ಟಿನಬೇಣ ೫.೬೫೦ ೪೦೪.೦೭ ೫.೧೦ ೨೦-೦೨-೨೦೨೩ ೦.೫೫ ಕಿ.ಮೀ ಉದ್ದವನ್ನು ಕೈಬಿಡಲಾಗಿದೆ.
೬೧ ಎಮ್‌ಆರ್‌ಎಲ್ ೦೨ ಎಸ್ ಹೆಚ್-೪೮ ದಿಂದ ಮರಾಕಲ್ ಕ್ರಾಸ ವಾಯಾ ಹೊಟ್ಟಿನಶಿರೂರ್, ವಡ್ಡಿಗದ್ದೆ, ಹಿಂಡಗೋಣ, ಹಣಕಲ್, ಗುಡ್ಡೇಕೇರಿ, ಕಂಡವಳ್ಳಿ, ಅಜ್ಜಿಗದ್ದೆ ಮರಾಕಲ್ ಸೇತುವೆ (೧೦x೩x೨ ಗಿeಟಿಣ ೭.೫೦ಕಿ.ಮೀ) ೨೦ಮೀ ೯೧.೩೫ ೦.೦೦ ೨೬-೧೨-೨೦೨೨ ಸೇತುವೆ ಕಾಮಗಾರಿ ಮುಗಿದಿದೆ.
ಒಟ್ಟೂ ೨೪.೯೧೦ ೧೯೩೪.೬೨ ೨೪.೪೯
ಅಂತೂ ಒಟ್ಟೂ ೩೦೦.೭೦ ೨೬೮೯೫.೧೧ ೨೬೨.೭೩

PMGSY works under taken in Belagavi

Taluk Name Project PDF
KHANAPUR Details of roads taken up by KRRDA and handed over to PRED period and under maintenance of Khanapur Taluka. Year : 2005-2016 PDF
GOKAK Progress Report of Pradhan Mantri Gram Sadak Yojana From Year 2007-08 to 2013-14 PDF

Details Of Roads Connecting Habitations with Population

ANKOLA-PMGSY-Roads Connecting Habitations with Population -                   PDF

BHATKAL-PMGSY-Roads Connecting Habitations with Population -                   PDF

HALIYAL-PMGSY-Roads Connecting Habitations with Population -                   PDF

HONNAVARA-PMGSY-Roads Connecting Habitations with Population -                   PDF

JOIDA(SUPA)-PMGSY-Roads Connecting Habitations with Population -                  PDF

KARWAR-PMGSY-Roads Connecting Habitations with Population -                   PDF

KUMTA-PMGSY-Roads Connecting Habitations with Population -                   PDF

MUNDAGOD-PMGSY-Roads Connecting Habitations with Population -                  PDF

SIDDAPURA-PMGSY-Roads Connecting Habitations with Population -                 PDF

SIRSI-PMGSY-Roads Connecting Habitations with Population -                   PDF

YALLAPURA-PMGSY-Roads Connecting Habitations with Population -                   PDF

Gallery