Milestones / Special Initiatives / Railway Development

Railway Development

Infrastructrural developments

  • 7 KM of doubling track has been commisioned between Shivthan-Londa-Tinaighat stations at a cost of Rs. 119 Crore to ease out the congestion of traffic.
  • In Londa-Tinaighat section Limited Height Subway (LHS) is provided in lieu of Level Crossing Gate No. 32 and in Tinaighat-Castlerock section Limited Height Subway is provided in Lieu of Level Crossing Gate No. 09 at a total cost of Rs. 2.3 Crore.
  • Additional running line to Road No. 5 has been provided at Tinaighat railway station at a cost of Rs. 40 Lakh to improve the rail traffic mobility

Improvement in passenger amenities

  • 10 Nos of CCTV cameras at Castlerock station & 12 Nos. of CCTV cameras at Londa station have been provided at a Tota; cost of Rs. 20 Lakh.
  • Ticket booking facility has been improved at Tinaighat & Castle Rock station at a total cost of Rs. 2 Lakh.
  • For ease of ticketing, 02 Nos. of Automatic Ticket Vending Machines(ATVMs) have been provided at Londa railway station.
  • Railway Reservation facility has been provided at post office at Yellapur, Dandeli, Haliyal, Sirsi and Mundgod for the benefit of the public.
  • To provide pure drinking water at an affordable price, 02 Nos. of Water Vending Machines (WVMs) have been provided at Londa Station.
  • Waiting hall at Castle Rock railway station has been renovated at a cost of Rs. 8 Lakh.
  • Circulating area of Castle Rock station has been improved at a cost of Rs. 5 Lakh.
  • New Signages are provided at Londa railway station to guide the passengers at a cost of Rs. 1 Lakh.

Others

  • Train No.17420/19 Vasco Da Gama-Tirupathi-Vasco Da Gama Weekly Express has been introduced.
  • Stoppage of Train No.56921/22 Hubballi-Belagavi-Hubballi Daily Fast Passenger has been provided at Londa railway station.

Ongoing works

  • Doubling and electrification of tracks between Londa and Miraj Railway stations is in progress.
  • Provision of lifts and escalators at important railway station has been approved. station.

Details of New trains introduce/stoppages given during last 4 years in Uttarakannada district

1 2014-15 (5 trains)

22655/22656

Thiruvananthapuram - H. Nizamuddin

Inaugural run Ex TVC on 11/02/2015

Regular run Ex TVC on 18/02/2015 stoppage – KW,

2

22653/22654

Thiruvananthapuram - H. Nizamuddin (weekly)

Regular run Ex TVC on 14/02/2015

Ex NZM on 16/02/2015 stoppage – KW,

3 2016-17

19332/19331 Indore – Kochuveli Express (weekly)

Inaugural run on 28/06/2016 Ex INDB

Regular run : Ex KCVL on 01/07/2016

Ex INDB on 05/07/2016 stoppage – KW,

4 2017-18

70102/70101 & 70104/70103 KAWR-PERN-KAWR DEMU

Flagging off of Upgraded KAWR-PERN DEMU Train on 04.09.2018

ASNOTI STATION

Sl No Amenities Provided Expenditure
1

Provision of One number of modular shelter of

30 sq. mtrs area with lighting in the platform

2.57
2 Provision of 5 numbers of concord benches. 0.48
3 Provision of 10 numbers of steel benches 0.60
4

Provision of Improvement of lighting at toilets

& provision of mobile charging points.

0.60
5

Replacement of AC Sheets by better quality

precasted GI sheets

5.0
6 Improvement of parking area 0.25

KARWAR STATION

Sl No Amenities Provided Expenditure
1

Provision of Passenger Reservation System

(PRS) at Naval Base, Karwar

13.40
2 Provision of Bio toilet 5.94
3

Provision of Foot Over bridge from Platform 1

to Platform 2.

95.68
4

Provision of Kota stone flooring on the main

platform shelter area on PF No.1

9.20
5

Installation of Organic Waste Converter plant

at Karwar Station Colony

7.5
6 Provision of CCTV 14.22
7

Provision of 4 numbers of Modular Shelter of

30 sq. mtrs each (2 each on PF No.1 & 2) (Total 120 sq. mtr)

8.60
8

Renovation of General and physically

challenged toilets

5.1
9

Renovation of Gents and Ladies waiting hall

with toilets etc complete.

10 Provision of Digital GPS platform clock on 0.34
11 Provision of Auto Floor cleaning machine 0.88
12

Provision of 8 numbers of stainless steel

benches for waiting hall

1.00
13 Provision of 36 numbers of concord benches 3.43
14

Provision of interlocking and chequered tiles

on PF No.1

25.47
15 Provision of LED lighting facility 7.20
16 Replacement of old water cooler 0.50
17

Provision of drinking water pedestals on

platform no. 2

3.79
18

Construction of 2 numbers of Modular

Shelters 60 sq. mtr each on PF No.1 and PF No.2

8.60
19

Provision of Passenger Announcement

System for PF- 2

3.66
20

Provision of 16 numbers of concord benches

1.72
21

Repair & Improvement of circulating area of

Karwar station

17.89
22

Up gradation of passenger amenities on PF

No-2 of KAWR station by providing PF

Shelter, 3 span (RDSO Butterfly type) with

kota stone flooring and construction of 1 No

Bio-Toilet for 200 users.

47.33
23

Replacement of old and outlived PF lighting

with 7.5 mtrs height GI pole by energy

efficient LED light fitting along with 5.5 mtrs

height GI poles on PF-l at Karwar Railway

station

9.83

HARWADA STATION

Sl No Amenities Provided Expenditure
1

Provision of 5 numbers of concord benches

0.48
2 Provision of 2 numbers of stainless stee benches 0.26
3

Provision of Improvement of lighting at toilets

& provision of mobile charging points.

0.06

ANKOLA STATION

Sl No Amenities Provided Expenditure
1

Provision of STBA

--
2

Provision of 01 nos modular Shelter, 30 sq.

mtr. Area with lightings each in the year 2015- 16

2.57
3

Provision of 13 Numbers of concord benches

in platform

1.27
4

Provision of 4 numbers of steel benches

0.51
5

Provision of Improvement of lighting at toilets

& provision of mobile charging points.

0.08
6

Provision of 8 numbers of concord benches

0.85
7

Construction of 1 number of Modular Shelters

60 sq. mtr

4.3
8

Renovation of toilets.

3.15

GOKARNA STATION

Sl No Amenities Provided Expenditure
1

Provision of CCTV camera (video surveillance

system)

14.00
2

Provision of 01 nos modular Shelter, 30 sq.

mtr. Area with lightings each in the year 2015- 16

2.57
3

Provision of Extension of platform length for

24 coaches with lighting

14.49
4

Provision of 17 numbers of concord benches

1.73
5

Provision of 4 numbers of stain less steel

benches

0.51
6

Improvement of lighting at toilets & provision

of mobile charging points.

0.08
7

Provision of Repair of station approach road.

5.5
8

Provision of 8 numbers of concord benches

0.85
9

Construction of 2 numbers of Modular

Shelters 60 sq. mtr

4.3
10

Renovation of toilets

3.15
11

Replacement of PA system

3.47

KUMTA STATION

Sl No Amenities Provided Expenditure
1

Provision of ramp on Foot Over Bridge on PF

No.2 & solar lighting

19.76
2

Provision of 03 nos modular Shelter, 30 sq.

mtr. Area with lightings each in the year 2015- 16

7.71
3

Provision of Ethnic food stall.

--
4

Provision of 18 numbers of concord benches

1.72
5

Provision of Improvement of lighting at toilets

& provision of mobile charging points.

0.9
6

Provision of high mast of 16mtrs height with

LED light fittings (for illumination of circulating

area & parking area).

6.37
7

Replacement of water cooler.

0.5
8

Provision of Construction of RCC Ramp

connecting platform No. 1 to existing Foot

Over Bridge

18.5
9

Repair of station approach road.

5.5
10

Renovation of toilets

3.15
11

Provision of 8 numbers of concord benches

0.85
12

Construction of 2 numbers of Modular Shelters

60 sq. mtr

4.3
13

Renovation of toilets.

3.15
14

Replacement of PA system

3.47

HONNAVAR STATION

Sl No Amenities Provided Expenditure
1

Provision of Passenger Reservation System

(PRS) at India Post, Honnavar.

6.6
2

Provision of 03 nos modular Shelter, 30 sq.

mtr. Area with lightings each in the year 2015- 16

7.71
3

Provision of 6 numbers stainless steel

benches for waiting hall

0.76
4

Provision of 26 numbers of concord benches

2.49
5

Provision of Improvement of lighting at toilets

& provision of mobile charging points.

0.13
6

Provision of lighting for approach road.

0.29
7

Provision of 8 numbers of concord benches

0.85
8

Partial Improvement of platform surface and

replacing of coping slab

6.00
9

Construction of 2 numbers of Modular

Shelters 60 sq. mtr

4.3

MURDESHWAR STATION

Sl No Amenities Provided Expenditure
1

Provision of 02 nos modular Shelter, 30 sq.

mtr. Area with lighting in the year 2015-16 (one in each Platform)

5.14
2

Provision of Bio Toilets with

electrification/lighting for Ladies and Gents in

Platform no.1.

6.15
3

Provision of Ethnic food stall.

--
4

Provision of 6 numbers of stainless steel

benches

0.76
5

Provision of Improvement of lighting at toilets

& provision of mobile charging points.

0.13
6

Provision of 18 numbers of concord benches

1.73
7

Improvement of lighting at toilets & provision

of mobile charging points.

0.13
8

Provision of 4 numbers of concord benches

(2016-17)

0.85
8

Construction of high level platform (Platform No.2)

40.00
9

Construction of 1 loop line including

Earthwork, Extension of minor bridges, Track

linking and Pway materials.

460.0
9

Construction of Foot Over Bridge

73.00
10

Construction Platform shelter, water pedestal

on PF-No.2.

16.00
10

Construction Platform shelter, water pedestal

16.00
10

Construction of 1 numbers of Modular Shelters

30 sq. mtr on Pf-1

2.15
11

Asphalting of circulating area

3.0
12

Improvement of circulating area of

Murdeshwar station

14.70

MANKI STATION

Sl No Amenities Provided Expenditure
1

Provision of 5 numbers of concord benches

0.48
2

Provision of 5 numbers of steel benches

0.30
3

Provision of 2 numbers of stainless steel

benches

0.26
4

Approach road repairs with circulating area by

asphalting.

4.0
5

Improvement of lighting at toilets and provision

of mobile charging points

0.08
6

Improvement of station approach road and

circulating area of Manki station

9.0

BHATKAL STATION

Sl No Amenities Provided Expenditure
1

Provision of 03 nos modular Shelter, 30 sq.

mtr. area each with lighting in the year 2015-16

7.71
2

Provision of 18 numbers of concord benches

1.73
3

Provision of 10 numbers of stainless steel

benches

1.20
4

16 nos. CCTV provided on PF-1 & in 2,

Circulating area.

14.0
5

Improvement of lighting at toilets & provision

of mobile charging points

0.13
6

Replacement of water cooler

0.57
7

Approach road repairs with circulating area by

asphalting.

6.0
8

Provision water pedestals at PF-No 1 and

PF-No 2. (5 numbers, (1 on PF No.1 & 4 on PF No.2)

4.5
9

Provision of 8 numbers of concord benches

0.85
10

Replacement of PA system

3.47
11

Construction of 2 numbers of Modular Shelters 60 sq. mtr

4.3

PROPOSED NEW CROSSING STATION MIRJAN

Sl No Amenities Provided Expenditure
1

Construction of 1 loop line including

Earthwork, Extension of minor bridges, Track

linking and Pway materials

569.0
2

Construction of High level platform

40.0
3

Construction of station building

71.0
4

Construction of approach road

16.0
5

Providing Bore well

4.0
6

Bridge/pipe culvert extension

28.0
7

Construction of platform shelter (3 X 20M)

16.0
8

Staff quarters

32.0

Gallery